<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Zecon Berhad &#187; Infrastructure</title>
	<atom:link href="http://www.zecon.com.my/category/business_divisions/infrastructure/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.zecon.com.my</link>
	<description></description>
	<lastBuildDate>Wed, 29 Jun 2011 04:06:52 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	
		<item>
		<title>Tun Salahuddin Toll Bridge Project</title>
		<link>http://www.zecon.com.my/completed_projects/tun-salahuddin-bridge/</link>
		<comments>http://www.zecon.com.my/completed_projects/tun-salahuddin-bridge/#comments</comments>
		<pubDate>Wed, 12 Mar 2003 00:43:03 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Completed projects]]></category>
		<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.zecon.com.my/2007/07/12/tun-salahuddin-bridge/</guid>
		<description><![CDATA[The 6-lane, dual-deck Tun Salahudin Bridge is an elegant, low-level bridge over the Sarawak River that affords an unrestricted view of the river in both directions. This bridge is a multi-span, pre-stressed concrete, 339 metres long, 28 metres wide, with a 325-metre embankment. It has a 1.5-metre central median and a granolithic pedestrian lane on [...]]]></description>
			<content:encoded><![CDATA[<p><img src="/images/tun_salahuddin_bridge.jpg" alt="tun_salahuddin_bridge" align="center" /></p>
<p>The 6-lane, dual-deck Tun Salahudin Bridge is an elegant, low-level bridge over the Sarawak River that affords an unrestricted view of the river in both directions.</p>
<p>This bridge is a multi-span, pre-stressed concrete, 339 metres long, 28 metres wide, with a 325-metre embankment. It has a 1.5-metre central median and a granolithic pedestrian lane on either side, each 1.5 metres wide.</p>
<p>This balanced cantilever bridge has a navigational clearance height of 9.07 metres above water and a navigational channel width of 65 metres. It is complete with architectural finishes and lightings. The entire scope of this undertaking entailed, in addition to the structure of the bridge, the construction of a four-lane road, a toll plaza, a toll plaza administration building and a roundabout to conclude the proposed span of works.</p>
<p><img src="/images/tun_salahuddin_bridge2.jpg" alt="tun_salahuddin_bridge" align="right" />The project was successfully completed in September 2003, and the bridge was officiated by the Chief Minister of Sarawak, YAB Pehin Sri Dr. Haji Abdul Taib Mahmud, on 21 September 2003. The toll road was then gazetted and concession commenced in October 2003.</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zecon.com.my/completed_projects/tun-salahuddin-bridge/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Simpang Tiga Flyover</title>
		<link>http://www.zecon.com.my/completed_projects/simpang-tiga-flyover/</link>
		<comments>http://www.zecon.com.my/completed_projects/simpang-tiga-flyover/#comments</comments>
		<pubDate>Fri, 12 Jul 1996 00:48:52 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Completed projects]]></category>
		<category><![CDATA[Infrastructure]]></category>

		<guid isPermaLink="false">http://www.zecon.com.my/2007/07/12/simpang-tiga-flyover/</guid>
		<description><![CDATA[Scope of work: Survey and clearance of project site including removal of existing vegetation and obstructions Execution of earthworks for cuttings and embankments Construction of pavements Execution of piling works to structures, embankments and drains Supply and installation of street lightings Diversion of affected utilities including water, electricity and telecommunications Provision of temporary road diversions [...]]]></description>
			<content:encoded><![CDATA[<p><img src="/images/simpang_tiga_flyover.jpg" alt="simpang_tiga_flyover" /><br />
<span class="headline">Scope of work:</span></p>
<ul>
<li>Survey and clearance of project site including removal of existing vegetation and obstructions</li>
<li>Execution of earthworks for cuttings and embankments</li>
<li>Construction of pavements</li>
<li>Execution of piling works to structures, embankments and drains</li>
<li>Supply and installation of street lightings</li>
<li>Diversion of affected utilities including water, electricity and telecommunications</li>
<li>Provision of temporary road diversions</li>
<li>Development of all major and minor road junctions</li>
<li>Provision of road accessories</li>
</ul>
]]></content:encoded>
			<wfw:commentRss>http://www.zecon.com.my/completed_projects/simpang-tiga-flyover/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

