<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Zecon Berhad &#187; Water Infrastructure</title>
	<atom:link href="http://www.zecon.com.my/category/business_divisions/water_infrastructure/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.zecon.com.my</link>
	<description></description>
	<lastBuildDate>Wed, 29 Jun 2011 04:06:52 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	
		<item>
		<title>Project Skim Bekalan Air Triang, Jelebu, Negeri Sembilan (Package 5 &#8211; Construction of Triang Dam)</title>
		<link>http://www.zecon.com.my/current_projects/project-skim-bekalan-air-triang-jelebu-negeri-sembilan-package-5/</link>
		<comments>http://www.zecon.com.my/current_projects/project-skim-bekalan-air-triang-jelebu-negeri-sembilan-package-5/#comments</comments>
		<pubDate>Mon, 03 Aug 2009 02:18:57 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Current projects]]></category>
		<category><![CDATA[Water Infrastructure]]></category>

		<guid isPermaLink="false">http://www.zecon.com.my/?p=183</guid>
		<description><![CDATA[CONSTRUCTION OF SG. TRIANG DAM AND ASSOCIATED WORKS GENERAL PROJECT INFORMATION The Works will form part of the Triang Water Supply Scheme, which, when completed, will enable the transfer of raw water via tunnel and pipelines from Sg. Triang at Petaseh intake in Jelebu district to treatment works in Seremban district. SCOPE OF PROJECT The [...]]]></description>
			<content:encoded><![CDATA[<h3>CONSTRUCTION OF SG. TRIANG DAM AND ASSOCIATED WORKS</h3>
<h3>GENERAL PROJECT INFORMATION</h3>
<p><strong> </strong>The Works will form part of the Triang Water Supply Scheme, which, when completed, will enable the transfer of raw water via tunnel and pipelines from Sg. Triang at Petaseh intake in Jelebu district to treatment works in Seremban district.</p>
<p><img class="alignnone size-full wp-image-505" title="Package 5 - Pic 1" src="http://www.zecon.com.my/v2/wp-content/uploads/2009/08/Package-5-Pic-1.jpg" alt="" width="600" height="450" /></p>
<h3>SCOPE OF PROJECT</h3>
<p>The Scope Of Work Comprises:</p>
<h4>A. Civil and Building Woks</h4>
<ol>
<li>Earth fill dam 66 metres high by 300meters long.</li>
<li>Spillway and Stilling Basin</li>
<li>75 meters high Draw Off Tower,  Five (5) meters diameter horseshoe Diversion Tunnel</li>
<li>Foundation and fissure grouting at the Dam site.</li>
<li>Geotechnical instrumentation  of the Dam.</li>
<li>Site Clearance of about 240 hectares.</li>
<li>4KM upgrading of existing Access Road.</li>
<li>Miscellaneous ancillary works including Service Buildings.</li>
</ol>
<h4>B. Mechanical and Electrical Works</h4>
<ol>
<li>Design, manufacture, testing at manufacturer&#8217;s works, delivery, installation, testing at site, setting to work and commissioning of plant and equipment for the M &amp; E work.  Electrical distribution system and instrumentation system inclusive of all mechanical, electrical and other plant all as specified including valves, penstocks, pipeworks and fittings.</li>
</ol>
<h4>C. All other ancillary works required for the completion of the Works as necessary and as specified.</h4>
<h4>D. The training of the personnel of the Employer for the Operation and Maintenance of the Works.</h4>
<p><strong>As at the month of August 2010, the physical work-in-progress is approximately 32%</strong></p>
<p><strong><br />
</strong></p>
<div><strong><img class="alignnone size-full wp-image-502" title="Package 5 - Pic 2" src="http://www.zecon.com.my/v2/wp-content/uploads/2009/08/Package-5-Pic-2.jpg" alt="" width="600" height="450" /></strong></div>
]]></content:encoded>
			<wfw:commentRss>http://www.zecon.com.my/current_projects/project-skim-bekalan-air-triang-jelebu-negeri-sembilan-package-5/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sungai Muar Raw Water Transfer Project</title>
		<link>http://www.zecon.com.my/completed_projects/sungai-muar-raw-water-transfer-project/</link>
		<comments>http://www.zecon.com.my/completed_projects/sungai-muar-raw-water-transfer-project/#comments</comments>
		<pubDate>Tue, 12 Jul 2005 01:52:41 +0000</pubDate>
		<dc:creator>Admin</dc:creator>
				<category><![CDATA[Completed projects]]></category>
		<category><![CDATA[Water Infrastructure]]></category>

		<guid isPermaLink="false">http://www.zecon.com.my/2007/07/12/sungai-muar-raw-water-transfer-project-kuala-pilah-negeri-sembilan-darul-khusus/</guid>
		<description><![CDATA[Sungai Muar Raw Water Transfer Project, Kuala Pilah, Negeri Sembilan Darul Khusus The Sungai Muar Raw Water Transfer project commenced on 15 March, 2004. This project involved the construction and supervision of all civil and structural engineering works and building services. ZECON has designed, manufactured, supplied, delivered, installed, tested and commissioned the mechanical and electrical [...]]]></description>
			<content:encoded><![CDATA[<h3>Sungai Muar Raw Water Transfer Project, Kuala Pilah, Negeri Sembilan Darul Khusus</h3>
<p><img src="/images/water_transfer2.jpg" alt="water transfer" align="center" /></p>
<p>The Sungai Muar Raw Water Transfer project commenced on 15 March, 2004. This project involved the construction and supervision of all civil and structural engineering works and building services.</p>
<p><img src="/images/water_transfer1.jpg" alt="water transfer" align="left" />ZECON has designed, manufactured, supplied, delivered, installed, tested and commissioned the mechanical and electrical works at the 100MLD intake site and raw water pumping station. The manufacture, supply and laying of the 17-kilometre DN1150mm mild steel concrete-lined pipeline for supplying water from the Muar River to the Talang Dam in Kuala Pilah, Negeri Sembilan have also been successfully completed.</p>
<hr class="clear" /><img src="/images/water_transfer3.jpg" alt="water transfer" align="right" /><span class="headline">Awarded to:</span><br />
N S Water Konsortium &#8211; ZECON JV Sdn Bhd</p>
<p><span class="headline">Awarded by:</span><br />
Jabatan Bekalan Air Negeri Sembilan (JBANS)</p>
]]></content:encoded>
			<wfw:commentRss>http://www.zecon.com.my/completed_projects/sungai-muar-raw-water-transfer-project/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>

