Sungai Muar Raw Water Transfer Project
Contract Sum (MYR)
64,000,000
Commencement/Completion
2004/2005
Sungai Muar Raw Water Transfer Project, Kuala Pilah, Negeri Sembilan Darul Khusus
The Sungai Muar Raw Water Transfer project commenced on 15 March, 2004. This project involved the construction and supervision of all civil and structural engineering works and building services.
ZECON has designed, manufactured, supplied, delivered, installed, tested and commissioned the mechanical and electrical works at the 100MLD intake site and raw water pumping station. The manufacture, supply and laying of the 17-kilometre DN1150mm mild steel concrete-lined pipeline for supplying water from the Muar River to the Talang Dam in Kuala Pilah, Negeri Sembilan have also been successfully completed.
Awarded to:
N S Water Konsortium – ZECON JV Sdn Bhd
Awarded by:
Jabatan Bekalan Air Negeri Sembilan (JBANS)