Sungai Muar Raw Water Transfer Project

Contract Sum (MYR)

64,000,000

Commencement/Completion

2004/2005

Sungai Muar Raw Water Transfer Project, Kuala Pilah, Negeri Sembilan Darul Khusus

water transfer

The Sungai Muar Raw Water Transfer project commenced on 15 March, 2004. This project involved the construction and supervision of all civil and structural engineering works and building services.

water transferZECON has designed, manufactured, supplied, delivered, installed, tested and commissioned the mechanical and electrical works at the 100MLD intake site and raw water pumping station. The manufacture, supply and laying of the 17-kilometre DN1150mm mild steel concrete-lined pipeline for supplying water from the Muar River to the Talang Dam in Kuala Pilah, Negeri Sembilan have also been successfully completed.


water transferAwarded to:
N S Water Konsortium – ZECON JV Sdn Bhd

Awarded by:
Jabatan Bekalan Air Negeri Sembilan (JBANS)